I'm using CMS Moving Configuration Objects between Environments
I'm new to CMS.
Step 1: In my XI DEV environment, I select the scenario that I wish to export to our QAS environment using CMS:
The conclusion of this step creates a transport that the Basis team then uses CMS to import into XIQ.
Step 2: Basis team uses CMS to import the transport I created in XI DEV environment into XI QA.
Step 3: In my XI QA environment, I view the transport that has been successfully imported into XI QAS. It has only the objects associated with the scenario I exported from XID:
This is where I start to get confused .
Step 4: The Basis team assembles the transport in CMS. They are waiting on an approval from me before the transport gets loaded to production. In XI QA I now see two transports:
The first transport (with a direction of import) was my transport that was created in XID. The second transport (with a direction of export) is new. This is probably what is being loaded to XIP. Could this have been created during the assemble process within CMS?
This new transport has ALL configuration objects associated with all of the scenarios in XIQ, including the configuration objects from my new scenario.
Is this correct behavior? Should I be passing everything to XI production or just the configuration objects associated with the transport I created in DEV? When using CMS, does it push everything from XI QAS to XI Production?
Thanks