calibration

res all,

we are sending different types of equipments outside for calibration purpose.for that i followed the procedure.

IE01

IA01(Control key PM03 ,with insp.char and with sevice package)

IP41(order type PM05)

IP10

now my query is :

in all steps there is work center feild and cost center field .

what we have to maintain why b'coz we r giving external and cost is capture by service PO.

plz clarify my doubt

thnx&regds

prasad

Edited by: prasad.k on Feb 23, 2008 10:55 AM

I mean what data i have maintain in above transactoins for my scenario

prasad

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Feb 23, 2008 at 07:51 AM

    As per best of my understanding the cost will be setteled aginst the PO. U need to maintin the Service Entry Sheet. against the PO.

    Regards,

    Shyamal Joshi

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Mar 23, 2008 at 04:47 AM

    thank u

    prasad

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.