Skip to Content
author's profile photo Former Member
Former Member

Service Order Planned Labor costs not displaying

Dear Experts,

In Service order Planned labor costs are not displaying,After confirmation i am able to see actual labor cost, i have cheeked all the below settings mentioned.

1. Maintain Value Categories

2. Assign Cost Elements to Value Categories.

3. Define Version of Cost Estimates for Orders

4. Define Default values for Value Catgories.

1. Maintain Costing Sheet

2. Maintain Costing Variant

3. Define Valuation Variant

4. Assign Costing Parameters and Results Analysis Keys

The service Order i am creating is SM02 .

Thanks in Advance.

Chandra.

Add a comment
10|10000 characters needed characters exceeded

Related questions

7 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Nov 29, 2017 at 07:32 AM

    Dear Experts,

    Can I have inputs on the above thread.

    Thanks In Advance.

    Chandra.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 29, 2017 at 10:21 AM

    Can you post screen-shots of the folowing:

    • Operation tab
    • Cosst tab
    • Rep. Plan/Act. report on the Costs tab
    • Control tab

    .

    PeteA

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 29, 2017 at 12:26 PM

    control-tab.pngcost-tab.jpgplan-report-cost-tab.jpgoperation-tab.jpg

    HI Pete,

    Thanks for the reply, Uploaded the screen shots of the same.Chandra.


    control-tab.png (86.2 kB)
    cost-tab.jpg (93.7 kB)
    operation-tab.jpg (100.8 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 30, 2017 at 08:12 AM

    Chandra.

    I would start by having a look a the ZM01 costing variant via OKP6 (Control tab).

    PeteA

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 01, 2017 at 11:40 AM

    Hi Pete ,

    Can you let me know your inputs as I shared the screen shots on the same.

    Thanks

    Chandra

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 06, 2017 at 01:16 PM

    HI Pete,

    Did you get chance to look into the issue.

    Thanks In advance.

    Regards

    Chandra.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 06, 2017 at 05:14 PM

    I would start by having a look a the ZM01 costing variant via OKP6 (Control tab).

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.