Hi
Thanks for the quick answer. I have gone through the notes and the QA3 ask to Activate the switch for EA-PLM in the IMG activity "Activate SAP ECC Extensions".
This is a cross application activation.
I have checked in ECC 5.0 and this switch is not activated. So, If I activate it now, what all other things needs to be checked. Actually, for submitting the change request, we need to give the impact analysis. So, I am looking for some heads up.
Thanks
Ashish