on 02-21-2008 7:12 AM
Kindly suggest, what kind of setting do I need to do to bring QM lot (category BU) for planning in APO from R/3
Is any customizing setting required?
Regards,
Chetan
If you are using SCM 4.0 up then you can bring QM Lot / Inspection Lots to APO from R/3.
In R/3 side SPRO >> Integration with other SAP Components >> APO >> Application-specific Settings and Enhancements >> Settings for Stocks
Setup Transfer of Inspection Lots to APO needs to be checked.
Then create Integration Model for Inspection Lot and activate it.
Inspection Lots should then be in APO.
Somnath
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
If you want PPDS or CTM to consider QM Lots for Planning set "Stock in Quality Inspection" flag in Available Stocks under Demand tab of Location Product Master.
If its SNP then you need to add BU in the appripriate Category Group - most likely FP1 which is mapped to Production Confirmed keyfigure.
Hope this helps.
Somnath