on 02-21-2008 3:52 AM
hi all,
i am installing sap ecc 6 server. it's now processing import abap. the status is running 2, waiting 17, failed 0, complete 0, total 19. it likes this for long time (about 2 more hours). think my disk space is enough, i have 240GB in this partition. plz can anyone have pre-experience and tell my why?
any responses will be awarded!
thanks a lot!
samson
Hi,
The phase "IMPORT ABAP" usually take long time to execute. Donot worry until there are no failed processs.
Regards,
Sowmya K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Don't worry Import ABAP takes a hell lot of time.
You can check what actually happening by checking sapinst.log file in your sapinst temp Installation directory.
Other wise you can check log from sapinst FIle-> View Log.
Inside sapinst.log you will find which process is currently imported. And then you can check the log of that individual process from your installation directory.
User | Count |
---|---|
86 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.