MPS & MRP

Hi friends

In test erver

While MPS run for X finish material through T code MD41 then i am getting plan order with the semi finish and other components like phantom etc and through MD04 i could be able to convert toproduction order success fully .

but

In production server

For the same material X tried the MPS through T code MD41 then i am getting plan order without the semi finish material and other components like phantom materials are existing hence please help me to get the difference in Test server and production server.

what could be the problem as i am not getting the semi finish material in plan order.

required a help with PP gurus.....

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Feb 18, 2008 at 07:57 PM

    Dear,

    Please note that In test system and prod system the only difference is the mater data...hence just check the product and semifinished product MRP1, 2, 3, 4 data in test and prod system..you will get the problem..pl come back

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      I checked the FERT material for both in TEST and Production server found

      In test server

      "Total replenishment lead time (in workdays)" -- 20 days

      In production server

      "Total replenishment lead time (in workdays)" -- 45 days

      this could be the problem....?

  • author's profile photo Former Member
    Former Member
    Posted on Feb 18, 2008 at 07:25 PM

    Please Check if you have maintained planning file entires for the components (Check in MD21) and also whether you have converted all the MRP areas in to planning file entries (In SPRO)

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Feb 18, 2008 at 08:32 PM

    Hi,

    Please check the MRP type used in the material master in both systems.

    Regards,

    Senthilkumar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 19, 2008 at 03:59 AM

    Hi Srinivas

    Check wheather BOM gets exploded in production server you can see in plan order details itself.. See the Validity dates of BOM header material. And also see the system dates of Production server.

    As said earlier by PP gurus See the MRP type used for header material. It should MPS such as M0, M1 etc.,

    You can see the IMG of M0, M1etc., Whether the MRP procedure is MPS or not.

    Regards

    J. Saravan

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 19, 2008 at 04:12 AM

    Hi,

    Start the total planning run for master schedule items or single-item planning for master schedule items.

    You use interactive planning to check the planning result and finely tune the master plan for the master schedule items.

    Once the master plan has been finely tuned for the master schedule items, you start the total planning run for all dependent parts.

    You can start the planning run for all BOM levels directly from the total planning run for MPS. To do this, you set the indicator Process MRP materials in the initial screen of the total planning run for MPS. The system will only plan the other BOM levels if this indicator is set.

    Check this indicator has been there in test server and not in

    *Production server.Regards,*

    nandha

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 19, 2008 at 10:56 AM

    Hi

    Total replinishment time is the time that takes from the date of P.O to supply of material to you plant. It is procurement time.

    So your reorder stock should be based on the consumption per day and the replinishment time.

    Ex if your consumption per day 2 Nos and the replinishment time is 10 days . You reorder stock should be mimimum ( 10 X 2 = 202 )= 22 . So that before the stock exhausted the material will be supplied to the plant. Make some contingency stock so that your re order stock should be 22 ( 7 X 2 ) = 36 Nos keeping one week caushion.

    Regards

    J . Saravan

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.