availabilty check of production order during in case of change in dates

Hi Gurus,

Production order status is getting changes from Material committed to availability not checked , when ever i change the order finish dates.

is it possible to do availability check automatically when ever there is a change in dates.

doing manual availability check is not suggestible as user may miss to do . is it possible to make the availability check mandatory if there is a change in dates.

Thanks & Regards,

Mahesh.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 13, 2017 at 11:54 AM

    use screen variant and transaction variant Tcode is SHD0

    and make material availability check as mandatory.

    Regards

    Raj

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.