cancel
Showing results for 
Search instead for 
Did you mean: 

Do you have to run LB10 after posting GI through MIGO?

Former Member
0 Kudos

Hi Experts,

Need help understanding LB10. Recently switched jobs (in which both use SAP, different versions). At my previous job we used MIGO to post GI's and never had to run LB10 after. Is there a way to still use MIGO with out needing to run LB10 after posting?

Appreciate the help.

Accepted Solutions (0)

Answers (1)

Answers (1)

JL23
Active Contributor
0 Kudos

How one runs WM is very specific to the company, its consultants, the warehouse layout, picking strategies, the materials, the stock situation.

If auto TO creation is setup then LB10 is usually not needed to convert a transfer requirement into a TO, but as mentioned above there are others factors that have to be considered.

Best you get in contact with your local WM consultant to talk about that.