Skip to Content
0
Feb 15, 2008 at 07:01 AM

Unit of measure 309

47 Views

Hi,

I have the following issue.

1.one material A is procure with UoM KG after the GR.

2.same material A require material to material transfer posting (MB1B 309 )to convert as material B having with UoM KIA which is selling unit of measure.

but in SAP standard system it is not possible to have different UoM.for MB1B 309.

How this can be done in SAP?

Regards,

Chetan.