Skip to Content
author's profile photo Former Member
Former Member

Execute InfoPackage with status canceled but successfull

Hi,

We have some random errors when executing process chains (SAP NetWeaver BI 7.0). Sometimes, one InfoPackage comes red with status canceled.

However, there are no messages (right click on the red Infopackage in process chain log and displaying messages).

Besides, all is green in the monitor for this Infopackage, and the data are correctly loaded.

Is it a known bug ? Is there any solution to solve it ?

Thanks,

Thierry

Edited by: Thierry CHUPIN on Feb 14, 2008 10:32 AM

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Feb 14, 2008 at 10:04 AM

    Try to look the load details in RSMON. Simetime i found some load failed due to locks and the infopackaged is in red status, but it seems than in furthers database retries, the lock is released and load sucessful.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 14, 2008 at 02:11 PM

    I've searched for errors in the monitor, but couldn't visualize any.

    Where can I visualize these database locks errors ?

    Thanks,

    Thierry

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 14, 2008 at 04:03 PM

    I have one runtime error "MESSAGE_TYPE_X" on application component "BW-WHM-DST" and report name "SAPLRSPC_BACKEND".

    Error analysis |

    Short text of error message:

    No start information on process LOADING

    Long text of error message:

    Diagnosis

    For process LOADING, variant ZPAK_46JAXE92MAZKVM6P35LJHGC3H, the

    end should be logged for instance REQU_48TID05EO1TKUCD385KENZCJB

    under the log ID 48TD4XCI3XM0MDTZ7AVKR9NAV. However, no start has

    been logged for this process.

    System Response

    No log has been written. The process (and consequently the chain)

    has been terminated.

    Procedure

    If possible, restart the process.

    Procedure for System Administration

    Technical information about the message:

    Message class....... "RSPC"

    Number.............. 004

    Variable 1.......... "48TD4XCI3XM0MDTZ7AVKR9NAV"

    Variable 2.......... "LOADING"

    Variable 3.......... "ZPAK_46JAXE92MAZKVM6P35LJHGC3H"

    | Variable 4.......... "REQU_48TID05EO1TKUCD385KENZCJB"

    How can I go further on ?

    Thanks

    Edited by: Thierry CHUPIN on Feb 14, 2008 5:37 PM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jun 09, 2008 at 04:34 PM

    Hi Thierry,

    We just upgraded our environment to BI 7.0, and ran into similar error message in our production. I just wonder if you had the solution for this issue. Thanks.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.