cancel
Showing results for 
Search instead for 
Did you mean: 

shipping point , plant and storage location

former_member328462
Participant
0 Kudos

moHi, i got 2 division of product

Plant 5000

shipping point1- 1000

shipping point2- 2000

storage location- 1000

storage location- 2000

division material A - at storage location 1000

division material B - at storage location 2000

will create SO for Customer C for A arnd B under seperate Sales ofrder

When i create a SO for customer C under shipping point 1. It will pick only division material A from storage location 1000

regards n thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

>

> moHi, i got 2 division of product

>

> Plant 5000

>

> shipping point1- 1000

> shipping point2- 2000

>

> storage location- 1000

> storage location- 2000

>

> division material A - at storage location 1000

> division material B - at storage location 2000

>

> will create SO for Customer C for A arnd B under seperate Sales ofrder

>

> When i create a SO for customer C under shipping point 1. It will pick only division material A from storage location 1000

>

> regards n thanks

Hi Aik,

For your case first in

1)SPRO->Enterprise Structure->Assignment->Logistics Execution->Assign shipping point to plant

You should assign Shipping point 1000 and 2000 both to your plant 5000.

2) Enterprise Structure->Definition->Materials Managemnet_> Maintain Storage location

Choose Plant as 5000

Put Storage location 1000 and 2000 in that.

3) Logistics Execution->Shipping->Basic shipping Functions->Shipping points and goods receiving point determnation->Assign shipping points

here assign the valid shipping points to your plants....

4) Logistics Execution->Shipping->Basic shipping Functions->picking->Determine picking location->Assign Picking location->

Here for the shipping points assigned in the previous step your plants and storage conditions in material put your storage locations

This would solve problem

Reward if it helps

Regards

Abhishek Swarup

Answers (2)

Answers (2)

Former Member
0 Kudos

hello, friend.

did you make assignments in OVL3? it may look something like this...

shipping point + plant + storage condition (in material master) + storage location:

1000 + 5000 + 01 + 1000

2000 + 5000 + 01 + 2000

this assumes you made the necessary config for shipping point determination. (shipping condition + loading group + plant + shipping point)

regards.

Former Member
0 Kudos

Hi

Please check the Storage Location Determination in spro - LE - shipping - picking - determina picking location - assign picking locations.

Prasad