I am trying to update next inspection date via MIGO when Goods Receipting a production order which is held in the batch header and in a classification we have set up. I have used function modules to try and perform the update.
I have used both 'VB_UPDATE_BATCH' and QEVA_BATCH_UPDATE both by themselves and in an update task to update field QNDAT. (1st one updating MCHA and MCH1 the second one to update MCHA).
I had the code before in POST_DOCUMENT of BADI MB_MIGO_BADI and this made no difference either. Sometimes it updates if I cancel the material document and redo the goods receipt with the same production number but this is very inconsistent. I need this to be done when I am posting the goods receipt.
Does anyone have any ideas as I am at the end of my tether with this one?
Many thanks
Regards
Larissa Maryniuk
Edited by: Larissa Maryniuk on Feb 7, 2008 4:34 PM