configurable material

Hi

Dear PS Pals

I have got one scenario to implement which needs repeated operations of one common set of business processes to produce final product.Since every time, scale/set of parameters are different,i need to go for configurable material coupled with assembly processing.Can anybody send me set of configuration guidelines /soft material on adwait.deshpande@siemens.com for doing above job and also piece of advice and experience sharing from you pals.Needs urgent help.

Best Regards

Adwait

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • avatar image
    Former Member
    Mar 07, 2008 at 02:23 PM

    Hi

    You need to maintain Planning Strategy 85 or 83 for the material the material master (MRP 3) { 85 is “Assembly processing network with project”, 83 is with network, w/o project.

    Also you need to maintain Network parameter for sales order (Transaction CN08).

    Amruta