on 11-20-2017 11:53 AM
Hi,
This is our Production ERP HANA landscape : Primary > Secondary(HA) > DR.
HANA replication is setup between Primary and Secondary.
HANA replication is setup between Secondary and DR.
The Primary and Secondary are a cluster.
This is a HANA Appliance model using scale up.
Any maintenance activity like OS upgrade or HANA revision upgrade requires a lot of downtime.
Especially for DR to Primary failback (and then replication setup).
We want to bring this downtime to near zero. Is this possible in the Appliance model and how can we achieve this.The database is 2.2 TB in size.
Thanks,
Rohan
Hi Rohan,
Kindly refer below SAP note as a starter point, there are various ways to achieve it.
1984882 - Using HANA System Replication for Hardware Exchange with minimum/zero Downtime
Best,
Amit Lal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
82 | |
10 | |
10 | |
9 | |
6 | |
6 | |
5 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.