on 11-20-2017 11:34 AM
Hi, in my company we changed from Discrete to REM production, but we have a problem with Cost Estimate (CK11N),
We make an cost estimate in CK11N now in REM and only appear the components from Phantom assem. The machines and labour time dont appear on CK11N.
Our solutions is repeat all machines and process in last Routing. Is this normal or there are something wrong?
So, this is the CK11N, in yellow the work centers:
Only appear these work centers:
But in phantom i have these to:
So,the materials appear in CK11N but the Work Centers no.
Thks in advance, and sorry for my bad english.
check your rate routing i think your planned quantity is very small thats why its showing zero value.increase planned quantity in rate routing and check again. If problem remain the same then share rate routing screen shot. please also check its planned cost in kp26 as well. may be its two small thats why its showing zero value in ck11n
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Check your quantity structure settings in costing variant, specially routing section.
Regards
Rajneesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
first check quantity structure in costing variant.? if its ok then please share screenshot? does system posting any error at the time of ck11n?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.