Former Member
0 Kudos

hi genius,

my question is in a sales order we have 4 items in that 1 st item having availability check in material master as no check, 2 item has 01 daily requirements, 3 item having individual requirments. In this case how the system act. Can any one solve this issue.

and one more thing how daily requirement and individual requirement will work in material master. not in sd pointview, mm, pp point of view. any one give me examples how does this two things acts.

Thanks in advance

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

According to ur scenario, the1st item will not pass any requirements to MRP, since u have not made availability check in mat.master

Also the availability check is depends upon the scheduline line category.

It is determined by the combination of item category and MRP type. If u tick the availability check at sched. line category level,the system will do avail, check.

So ur first item will not pass any requirements to MRP, but it will give some confirmed date.

For 2nditem, it will pass the requirements at daily basis(cumulated qty for the date).

For 3rd item, this also will pass the req. to MRP but the individual transaction(order) level.

For ur second scenario,

If u goto the MD04 screen, if u select the indiv. requirements, u can see the material requirements in the level of each and every transaction (Ex; u can see the order/delivery/pur. req Nos and the required and confirmed qty)

In the case of daily requirements U can't view the requirements individually, but u can see either daily or weekly or monthly basis.

take 2 materials and make a trial by selecting 2 different requirements.

Hope u can understand. any further queries are welcomable.

Do Reward points if useful../

Regards

Kaleeswaran B

former_member204513
Active Contributor
0 Kudos

Hi Nag,

The system will act will based on the configuration only

1.You are telling that there in no Availability check for the first item right, so the system will confrom the first item quantity without considering the availability check.

2. For the second item you have 01 availability check that is daily requirements right for this the system will transfer the rquirements to the pp on the daily base(date wise).

3. Third one is 02 Individual requirements, in this scenerio the system will show the transfer of requirements to pp for individual Sales order wise.

I hope it will help you

Thanks,

Murali.