Cost Component Structure Correction

User has accidentally maintained an overhead group (field MBEW-KOSGR via the Costing 2 tab in the material master) for two materials and 2 items got added to the cost structure wrongly. Later they realized that there should be no overhead group maintained for these material and so removed the entries from MBEW-KOSGR. Is there a way that the cost component structure be regenerated and those 2 wrongly added cost items be removed?

Thanks in advance.

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

2 Answers

  • Oct 19, 2016 at 05:30 AM

    I think the best possible way is to delete the cost estimate and re-run it.

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Oct 19, 2016 at 06:02 AM

    Hi Sagar,

    Have you run CCS of Ck11n and ck24 for those materials??