cancel
Showing results for 
Search instead for 
Did you mean: 

Embedded BPC activation error - System error 6 occured. Time limit exceeded

Former Member
0 Kudos

Hi Experts,

Receiving below error while activation the BPC content on S4HANA 1709 system . Navigation: SPRO --> Controlling --> General Controlling --> Planning --> Setup for Planning --> Activate BI content for Planning --> /ERP/SFIN_PLANNING Simplified Financials PlanningAnd then when we click on: Activate in Background. Later, after 4-5 hours, when we go to logs --> Error message: System error 6 occured. Time limit exceededWhen we go to ST22 Dumps, the program shown is:CLUR_MIME_HANDLER=====CP, as shown below. Pls suggest.

Accepted Solutions (0)

Answers (4)

Answers (4)

0 Kudos

any update on this? i am also facing the same error.

0 Kudos

Hi Anil,

I am Receiving below error while activation the BPC content on S4HANA 1709 system .Navigation: SPRO --> Controlling --> General Controlling --> Planning --> Setup for Planning --> Activate BI content for Planning --> /ERP/SFIN_PLANNING Simplified Financials PlanningAnd then when we click on: Activate . Error message: System error 6 occured. Time limit exceeded When we go to ST22 Dumps, the program shown is:

Program "SAPLRSDG_IOBJ_DB_READ" has exceeded the maximum uninterrupted runtime and has therefore been terminated.Please let me know if you can help me with this and how you corrected your issue?

error.png
Former Member
0 Kudos

This issue is resolved after correctly the RFC connection for embedded BW

Former Member
0 Kudos

Hi All,


Any updates on this issue.

Following the steps for BI Content Activation from below Note:

1972819 - Setup SAP BPC optimized for S/4 HANA Finance
and Embedded BW Reporting (aka Integrated Business
Planning for Finance)

And, currently struck at section: 3.2 in above Note