Hi All,
I am facing an issue while doing delivery system is bringing the wrong batches though stock is not available, so i throughly checked scope of check.
I unchecked the Check without RLT , after doing this configuration setting in the scope of check at the delivery system brings right batch of material available in the system.
Availability check-02 maintained in the MMR .
Now system unable to determine the stock while making the delivery w r to the sales order even though stock is available for the one line item and for the other lien items in the same sales order stock not confirmed.
If i uncheck the sales order requirements in the scope of the check at the delivery level , will lead to any impact and what are the other dependencies and more over if i uncheck the requirements will be passed to the MRP and what is impact.
Request any one please respond to this crititical issue.
Regards,
M Siva.