STD cost estimation and release in Previous period

Gurus

Can anyone tell me - Is it possible to run std cost estimation in the previous period(current month is Feb, I want to do it in Jan) and release?

In CK11n, system is not allowing me to save, as save button is disabled and in CK24, it is giving me the message as Period is in past. and can be done for this period i.e. Feb. or future period.

Your input is highly appreciated.

I know that it is possible directly is there any alternative method or some note?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Feb 04, 2008 at 08:24 AM

    HI Vittal

    Go to CKR1 and delete the Std cost for the previous Period and run the std cost for the previous period in CK11N and release. Plz assign points, if its helpful.

    Regards

    Rajaram

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.