Dear Gurus ,

For one material i hv to mantain rework order scinario,, i.e. rework should trigger automatically.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi,

Just carry with these steps OK:

First check in Tcode OPJF for the selection id a Priority is defined for the Task list type S with usage 1 and status 4 and then Proceed as follows:

1. Create a Reference op set in tcode Ca11.

Enter the plant,Description , usage and status for the ref op set Enter lotsize and unit of measure.

Enter the op as 0010 / workcenter/op control key/Description for the op Enter the standard values and save.

2. Create a Standard trigger point in CO31.(Ex Production)

Enter the Trigger Point usage /Group as FERT.

3. Tick the Trigger Point Functions.

4. Enable the indicator create order with Reference.

5. Enter the system status as PCNF.

6. Enter change as +.

7. Enable the indicator once.

8 . Now place the cursor on the create order with reference.

9. Goto Parameters.

10. In the Parameter enter in the group the created Reference op set group no.

11. Order type as PP01 and group counter as 1 and save the Trigger Point.

12. Now goto the Routing for your Material.

13. Choose the last op to assign the Trigger point.

14. Select the OP -


> Goto ---> Trigger Point overview.

15. Enter the Trigger Point usage as FERT.

16. Now choose that line ,select the Details---> Trigger Point f7. The system will says standard trigger point exists from which you can select the created Trigger Point (EXx Production)and save.

18. MD02/MD04.

19. Convert the Planned Order into Production Order and Release the order.

20. Now confirm th ops.

21. For the last op enter the yield and rework qty and set the status as PCNF.

22. If the status of last op is PCNF then in the system a POP UP will appear as Activited by Trigger Point /Create order with reference/order number/sequence and op number which trigger point works and enter.

Regards,

Madhu.G

Former Member
0 Kudos

Your question is not complete..can you tell us what did you maintain? what is required forn you?

Former Member
0 Kudos

Hi,

1. First create a Reference op set in tcode Ca11.

Enter the plant,Description , usage and status

for the ref op set

Enter lotsize and unit of measure.

Enter the op as 0010 / workcenter/op control

key/Description for the op

Enter the standard values and save.

2. Create a Standard trigger point in CO31.(Ex

Production)

Enter the Trigger Point usage /Group as FERT.

3.Tick the Trigger Point Functions.

4. Enable the indicator create order with Reference .

5.Enter the system status as PCNF.

6. Enter change as +.

7. Enable the indicator once.

8 . Now place the cursor on the create order with reference.

9. Goto Parameters.

10. In the Parameter enter in the group the created Reference op set group no.

11. Order type as PP01 and group counter as 1 and save the Trigger Point.

12. Now goto the Routing for your Material.

13. Choose the last op to assign the Trigger point.

14 .Select the OP -


> Goto ---> Trigger Point overview.

15. Enter the Trigger Point usage as FERT.

16.Now choose that line ,select the Details---> Trigger Point

17. The system will says standard trigger point exists from which you can

select the created Trigger Point (EXx Production)and save.

18. MD02/MD04.

19. Convert the Planned Order into Production Order and Release the order.

20 .Now confirm th ops.

21. For the last op enter the yield and rework qty

and set the status as PCNF.

22. If the status of last op is PCNF then in the

system a POP UP will appear as Activited by

Trigger Point /Create order with reference/order

number/sequence and op number which trigger point

works and enter.

22. Now a rework order will be created.

23. In c003 enter the number which is next to the actual prodn order no.Rework

order will be seen.

Pls reward if you found useful

Regards,

nandha

Former Member
0 Kudos

Thanks ,

its really usefulled and work out.

One more query, whether we need to define rework order type for automatic creation of rework order.

Which control key we have to use in t code ca11..reference operation set.

regards

DHIRAJ

Former Member

Hi,

Your answer has been very helpful. Thanks for writing so patiently.

Former Member
0 Kudos

Hi,

you can maintain order type as rework order itself and define as one master data and whenever you will create order for rework then do th echanges in order master data i.e. in routing and bom

reward points if useful to you.