Manual routing selection in REM.

Dear Gurus,

Is there any configuration settings for manual routing selection in REM ??

Regards,

Pradeep

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2008 at 05:50 AM

    Hi pradeep santara,

    Generaly routing is selected based prodution version at mfbf, could u please elaborate your requirement, that where u want to select routing ,manually.

    Regards

    pradeep

    Add a comment
    10|10000 characters needed characters exceeded

    • Dear Pradeep,

      Why do you want to select the Rotuing manually?

      Once if your Product has got 2 different routing ,it might be

      because of Shop Floor constraint or for costing purpose,after

      creating a new routing,you have to create a Production version

      for a combination of Rate routing And BOM.

      After that you have to create a Product Cost collector using the

      new Production version and create a preleminary product cost

      estimate for the product cost collector and save.

      If You want to decide at that time of production

      confirmation,which routing has to be used,then before this step

      you have to change the REM profile for that particular product (

      whose activities are posted using the Preleminary cost of the

      Product Cost collector).

      Check with this,your problem will be solved.

      If still exists,revert back to forums.

      Regards

      Mangalraj.S

  • author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2008 at 05:54 AM

    Hi Pradeep

    R u sure u want this setting in REM? B'cos this functionality could be done while dealing with creation of production orders in order type dependent parameters OPL8

    But in case of REM; since backflusing comes into picture viz related to PV; it is not a correct practise

    Please revert

    Rgds

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2008 at 09:15 AM

    Dear,

    NO config change required you can do with master data-Production version.

    In REM the assign different rate routing to different versions. In different versions make sure that lotsize, usage indicator (REM) is same but the production line is different and also rate routing number and group is different.

    Go for Prelimeinary cost estimation option in REM profile.

    Select the version in MFBF. SO athat system will selcet different routings and production line.

    Edited by: Rajesha Vittal on Feb 1, 2008 10:15 AM

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Feb 01, 2008 at 09:38 AM

    HI,

    Let me know why u want this exactly, wat is ur procedure.

    Nilesh

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.