rep man

hi all,

can anyone explain me the the exact functionality of rem profiles. bit confused with 0001 and 0002. please be very specific about activity confirmation profiles.

thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 10:41 AM

    Hi sanjeev,

    REM Profile will tell how we are going to perform this repetative manufacturing.

    With this profile we can determine following points.

    1.How the system deals with activities when backflushing.

    2.Which movement type is used to post goods receipts and

    goods issues.

    3.How planned order and run schedule quantities are reduced

    in the backflush transaction.

    4.How BOM corrections are made - if errors should occur

    when posting quantities to be backflushed.

    If you select 0001 profile that means we backflush using standard cost estmate of material.

    If you select 0002 profile that means we backflush using data from preliminary costing of product cost collector.

    Regards,

    Rajarao.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 10:38 AM

    Hi,

    Post activity indicator is active in 0001 and it is not in 0002.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 11:55 AM

    Hi Sanjeev,

    Rem profile several number of fuctions so please gothrough sap help files.

    Difference is, deponds on waht settings we are defined for each profile.

    For activity confirmatiom, when u do the final backflush uif u want to do teh activity posting along with GI & GR , u ahve to define the post activity setting at REM profile. Other wise activity will not be posted and u cannot use the sepearte "activity backflush" also.

    If u selct teh post activity , u have to do any of cost estimation either standard or preliminary cost estimate. , based which u can do the settings at REM profile.

    if u dowant to post activity during the backflush set the rem profile will not require the actvity settings.

    i hope ur doubt has cleared ifso please reward and clsoe thet thread

    Regards

    Pradeep

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.