Skip to Content
author's profile photo Former Member
Former Member

SAP XI

Hi All,

I am working on FILE2IDOC scenario. I have done all ALE settings at XI side and as well as at R/3 side. When i am executing this scenario the file is picking from sourch directory and i got the success message in XI server through SXMB_MONI. But at receiver (R/3 system) i got the error message " IDOC added with errors".

FILE System--


>XI--


>R/3 System.

I got the error at R/3 side. I think it's IDOC posting problem.

So, Please try to understand my problem and revert back to me ASAP with the solution.

Thanks & Regards,

Nagarjuna.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 10:12 AM

    Hi,

    In WE02 check what is the error ,is it data error or some ting else.Check it and update the thread.

    Regards,

    Phani

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 10:12 AM

    HI Nagarjun,

    Please go through this thread:

    Debugging idoc:

    debugging-customized-function-module-when-idoc-is-

    Check, If IDoc is in status 51, it means it was properly delivered to R/3. So you can now set a break-point in the respective IDoc handling function and reprocess the IDoc with BD87 (or report: RBDINPUT). Then debug the IDoc function and find where the error message is issued.

    BR,

    Alok

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 10:12 AM

    Hi,

    Can you please check the following:

    1) Port is created in IDX1 of XI.

    2) IDOC data should be uploaded in IDX2 in XI.

    3) RFC destination which points to XI should be created in XI.

    At R3 end:

    1) Check the port in We20 transaction

    2) Check the partner profile in WE21 transaction.

    3) Check the IDOC status record in WE02 or WE05 transaction and let me know the error message.

    Thnx

    Chirag

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 10:16 AM

    Hi,

    Please verify the status code of the IDOC in We02 or We05.

    The status code will give you more ellaborative error details

    Norammly if status code is

    51--> application doc is not posted check with it in R/3

    52 -- > partially posted

    53-->successfully posted

    54-->Error during formal application check

    56 -- > Idoc with errors may be partner profile error or inbound processing FM related error.

    Thanks

    Swarup

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.