Skip to Content
author's profile photo Former Member
Former Member

updating values in material master table

Hi,

I have a requirement where in which if the user wants to change the value of some fields of a particular record in the o/p,then he checks the checkbox of that record and click on the change button.Then the control goes to the update screen.There are many fields present in the update screen and also checkboxes were present beside each field.The user can change the values of the fields here and click on th execute button.Then only the checked field values should get updated in the material master table.

Can anyone tell me how only the checked field values can be updated in the material master table

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 02:06 PM

    are you attempting to program the standard transaction MM17 all over again?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.