Hi,

Do we have any checks in development to check integration repository/ Directory? Just like how we have Readiness check in Basis. If we have any checks in development, please do send the documents

Thank You,

Radhika.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 07:26 AM

    Hi Radhika,

    sorry, i am unable to get you.

    you want to check the IR and ID from technical prospective.

    then inorder to check mapping we have Test tabin IR.

    inorder to test the configuration, we have an option test configuration In ID.

    other than this, you have any thing let us know.

    regards

    mahesh.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 07:27 AM

    Hi,

    Please find the details of the attached weblog it should resolve your issue:

    /people/shabarish.vijayakumar/blog/2006/02/13/unable-to-open-iresrid-xipipi-71-updated-for-pi-71-support

    /people/sameer.shadab/blog/2005/11/27/java-web-start

    https://www.sdn.sap.com/irj/sdn/weblogs?blog=/pub/wlg/1688 [original link is broken] [original link is broken] [original link is broken]

    your mail id is not working to send the documents

    it is bouncing back.

    Regards,

    Nithiyanandam

    Reward points if helpful

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      First of all I didnt get ur question.

      Checks which need to be perform are

      1) Check whether the conncetion between SLD and ID is working correcly.

      For this u need to first create Bussiness system in SLD and then in ID import that BS if u r getting the list of created BS while imporing the BS then u ahve a connection between both of them.

      2) Check the conncetion between IR and ID.

      For this u first create an Integration scenarios and then in ID use the option import IS from IR,if u see the list then there is a connection between IR and ID.

      3) check whether u r able to see the list of all the adapters while selecting the adapter in communication channel.

      U should be able to see the list of all the adapters. if it is not present then u ahve to import the BASIS SWCV in IR.

      Thnx

      Chirag

  • author's profile photo Former Member
    Former Member
    Posted on Jan 31, 2008 at 07:55 AM

    Hi Radhika,

    check the following process at OS level :

    check whether Jlaunch process is running ?

    How much % it is consuming ?

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.