Correct scheduling of Maintenance Planning with Strategy - Time Based

Hello PM Gurus,

We have a Maintenance Plan with Time-based Strategy.

It has four Maintenance Items; with the 1st item containing a 3 Month Package, 2nd Item having a 6 Mon, 3rd Item with 9 Mon and 4th Item with a 12 Mon Package. The Scheduling Period is 5 Years.

We are getting the correct packages called for the first 5 calls, i.e., 3M --> 6M --> 9M --> 12M --> 3M.

After the 5th call, instead of scheduling the 6M package (at the 18th month of the scheduling period), system is scheduling the 9M package.

This is happening because the 9M package has greater hierarchy than 6M package. All subsequent calls are also being affected due to this.

Is there any way where we could get 3M --> 6M--> 9M--> 12M--> 3M --> 6M--> 9M--> 12M and so on?

Thank you!