Hello,

In infostructures S021, S022, S023 and S024 the time unit field DFZEH is set to DAY as SAP standard.

In IMG tc MCRG it seems to be possible to change this time unit which should be useful for short lead times and execution times(field MCPPCUST-DFZEH). Coincidence that field names are the same?

After running statistical update of S023 the unit is still DAY.

I don't see anything in the front end standard analysis that it is possible to change time unit. (This is possible for currency.)

I have tried different options but nothing gives me a result that I expect.

Does somebody know the effects of this IMG setting??

Thank you!

Best regards,

Tor Holter

Oslo, Norway

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 19, 2008 at 02:33 PM

    In LIS there are fields available for the exact times but those fields are not present in the standard Inforstructure. The solution is to create new ones (it is not possible to copy certain infostructure).

    These fields are part of BW/BI extract.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.