on 01-30-2008 10:39 AM
Hi Experts!
I have run in to an issue with the multilevel packagng.after creating the packaging instructions, we are going to setup the packaging determination recorod, now there are 4 options like
option 1 PACKAGING INSTRUCTIONS
option 2 ALTERNATIVE PACG INSTRUCTION1
option 3 ALTERNATIVE PACG INSTRUCTION2
option 3 ALTERNATIVE PACG INSTRUCTION3
What is the significance of all these 4 options in the packaging determination reccord(T-codePOF1)? Can someone please provide me some documentation regarding these four opeions?please..........
Rewards for the best inputs.
Thanks.
Ramesh
Hi ,
Got this somewhere from this forum, HTH
+++++++++++++++++++++++++++++++++++++++++++
you have to create the packing master data in tcodes POF1 and POP1.
In POP1 you create the packing rule, eg. how many pieces of the material to be packed can be stored in the packaging material (box, cans,...)
in POF1 you create the determination rule, eg. the link between the material and the rule.
for more details have a look to:
http://sap-img.com/sap-sd/process-in-packing.htm
http://sap-img.com/sap-sd/the-packing-process-with-an-example.htm
+++++++++++++++++++++++++++++++++++++++++++
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.