cancel
Showing results for 
Search instead for 
Did you mean: 

blocked for further processing.

Former Member
0 Kudos

hi every body

plz can anyone tell me

How to classify an item as 'Fast' or 'Slow' moving? There is a requirement to ensure that any PO with a slow moving item is automatically blocked for further processing.

thank u

mahesh

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

u have to decide the period on which the bifurcation has to be done.

u can block the material for further processing in Material master - purchasing view.

Former Member
0 Kudos

thanx for reply

how to do this bifurcation?but client don't want this material is to be block, in purchasing view.HE don't want to search that material but while creation of po,system should say that this is slow moving item,

how to link fast and slow moving items in relation to po

thank u

mahesh

Former Member
0 Kudos

hi,

\i dont think u have any such option in standard SAP.

how ever u can block the material for further purchasing, once u have the list of slow moving items, considering the last consumption pattern.

once u block the same u will get the message while creating the PR / PO