Hi,

My user want to update the freight cost which appears in the billing item condition type such as ZEFS & ZEFK. The calculation type of these two condition types are fixed amount.

These condtion types are maintained in V/06. But I am not able to locate the condtion record created for these two condition types. When I use VK13 to display these two condition type, there is error message "There are no access sequences for condition type ZEFS/ZEFK.

Under pricing procedure for ZEFK there is user exit as follow :

************************************************************

  • Attention: copied routine! ***

  • Attention: ***

  • Character string 004 is replaced by 904 everywhere ! ***

************************************************************

  • Determine costs according to item category configuration (TVAP)

form kobed_904.

sy-subrc = 4.

if komp-kposn ne 0.

check: t001-bukrs = t001k-bukrs.

check: komp-werks ne space.

*{ INSERT ARDK913764 1

  • if replenishment

if komp-PSTYV NE 'NLN'.

*} INSERT

check: komp-evrwr = 'X'.

*{ INSERT ARDK913764 2

endif.

*} INSERT

check: komp-fareg na '45'.

endif.

sy-subrc = 0.

endform.

  • Prestep

form kobev_904.

sy-subrc = 0.

endform.

Where can the freight costs being maintain in the system if it is not through condition record ? How to update these freight cost master data ?

Please advise,

Thanks.

Regards,

Xavier Tay

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jan 29, 2008 at 11:08 AM

    Hi Xavier,

    Maintain the access sequence at V/07, then assign that access sequence to your frieght cost condition types ZEFS & ZEFK, then you maintain the condiotion records at VK11 ,for those condition types you problem will be solved.

    Thanks,

    Murali.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.