Sub contract

Dear fnds,

I have to Implement Subcontrac Process,,,Please Send me Details of Subcontract process.

and what actually config i have to do.what r the Document s will update.

Thanks on Advance

With Regards

ram.P

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 29, 2008 at 07:26 AM

    Hi Venkat,

    Sub Contracting Cycle

    (1) You have a material that can be procured externally, and you have maintained BOM with components. Any waste generated and received during subcontracting process can be maintained as component with negative quantity.

    (2) You create a subcontracting PO (PO with Item Category L). You can also maintain Purchase Info Record for Subcontract category for material and subcontractor.

    (3) You make a transfer posting to issue components for SC PO. Material is sent to subcontractor. As material remains under your ownership, system does not make any value entry. But quantity is shown as "Material Provided to Vendor"

    (4) You receive finished material against SC-PO. You also specify components consumed in manufacturing of finished goods. Additionally, if you have negative components in BOM, now you'll also receive subcontracting by-products. There are three events, so three accounting entries are generated:

    DR FG Stock/ SC By-Product Stock

    CR Change in Stock (FG/ SC By-Product )

    (for finished goods received)

    DR Subcontracting Charges

    CR GR/IR Clg

    (for moneys payable to Subcontractor)

    DR Consumption (Components)

    CR Change in Stock (FG/ SC By-Product )

    (material provided to Vendor is now charged to expense)

    (5) You do the IV for SC Invoice, and the process is complete.

    Process of Subcontract

    Sub-contract business process:

    You want to buy material from the supplier (processed material/ assembled item) , but for some reason (quality of certain item / price ) you will give some component to vendor .

    Vendor shall process the item / use the item provided & supplies the final item.

    SAP process:

    1.Create the finished goods material code.

    2.Maintain the BOM for the material.

    3.Create PO with item category as "L" .

    4.Issue material to vendor with movement type 541

    5.Receive the material against the PO with movement type 101.

    6.MIRO to account for vendor's invoice for the service charge& material used by him.

    Can anybody tell me how a process has to be given to subcontracting?

    Suppose, I have 3 operations 1)weaving 2)dyeing 3)cutting & packing

    if no 2 process (i.e Dyeing) has to be given to subcontracting, what process should i follow ?

    The following process to be followed for subcontracting.

    1. Item code(material master) to be created at the stage of before dyeing.

    2. Item code(material master) to be created after Dyeing as subcontracted item.(F30)

    3. Bill of material to becreated for the material(2) calling for material(1)

    4. Inforecord and source list to be created for material(2) with the corresponding vendor

    5. PO to be released for material (2)

    6.Along with PO the material(1) to be issued to vendor

    7.On receipt of material when GR is made the stock with vendor will get updated.

    if you give me brief i can help you out more.

    if helpful REWARD points

    Thank you .

    Regards

    Ramana

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 29, 2008 at 08:15 AM

    please download the material given by baxter from WIKI

    u can have complete details over there

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.