Report to list out all components inside the production order till last level

0 Kudos

Hi All,

Is there any production order report which can display all the components along with its BOM components till the last level.

Currently in COOIS we can see the components displayed in the production order only.

Is there any standard report which gives you the all the materials till the raw material level.

Accepted Solutions (0)

Answers (2)

Answers (2)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

You can try report CO46.

0 Kudos

Hi Caetano,

The report CO46 cannot be used since if there are any order reservations or stock for the HALB parts it will not drill down to its components in this report.

I am looking for a report which will drill down the BOMs till the raw component level based on production order only.

Regards,

Tojo.

Caetano
Product and Topic Expert
Product and Topic Expert

Hello

There is no such report in the standard.

Regards,

Caetano

former_member513101
Active Contributor
0 Kudos

Hi Tojo,

Try CS12, if you want to view all the component in the BOM.

Thanks

0 Kudos

Hi KK,

Thanks for the quick response.

I need the report from the production order. Not from the BOM.

If my BOM structure is as below

Level1 - FERT

Level2 - HALB

Level3- ROHS

If I create production order for FERT and will I be able to see HALB inside the component list of production order.

But I want to see the ROHS also in a report. In short I need to see the entire list of materials till the last level in a report based on a production order.

It should not be based upon a material as you have mentioned as CS12.

former_member513101
Active Contributor

Hi Tojo,

If you want to see all component with cost then you may try phantom item for HALB or collective order.

Thanks.

0 Kudos

Hi KK,

I am having a CTO order and the requirement is to drill down till the raw component for the non phantom parts.

I think standard SAP do not have any reports to drill the BOMs till the last level even its a non phantom part based on the production order.

Regards,

Tojo.

former_member513101
Active Contributor

Hi Tojo,

Yes, So far i know there is no such sap standard report unless you use phantom parts or collective order.

Thanks