Can SAP take scrap into account with determining open production order qty?

SAP appears to completely ignore scrap on production orders. This isn't working for us. What we would like is something like this:

If the production order is for 20, we've confirmed scrap of 2, and confirmed 10 good, then the open quantity should be 8. The next time MRP runs, it should re-schedule the 2 for a later date.

I didn't see any way to accomplish this through settings on the order, or through configuration. Can anyone recommend a user exit I can use to accomplish this, or did I miss a setting somewhere?

Thanks,

Randy

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    Posted on Jan 28, 2008 at 04:46 PM

    Hi Randy,

    The scrap you are confirming is basically unplanned scrap...That is basically for consuming the components for the scrapped quantity ...but not to affect the total production.

    In your case you can maintain assembly scrap in material master...so that system will plan extra material while the MRP..

    For ex , if u want toa chieve a final qty of 100 & ur scrapping pattern is 20% ..syatem will plan for 12 % so that u can achieve 100 at the end of production.

    Regards

    Mahesh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 28, 2008 at 05:23 PM

    Dear,

    It is a dificult task, nover the less you can try.

    Alternative method is create a rework order manually refering the same production order, schedule the order as per the available capacity in m/c, when you run MRP it will not schedule automatically as you are thinking.

    You need to reschedule in planning table after running ,MRP leveking the capacity

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 28, 2008 at 05:01 PM

    Hi,

    You said that you don't want to adopt scrap, only other alternate is to go for pp03 rework order for scrap and other quality rejected items in the next run.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.