cancel
Showing results for 
Search instead for 
Did you mean: 

Problem in control Recipe

former_member677849
Participant
0 Kudos

Hi PP guru,

We are working with PP-Pi Scenario. Created master recipe and check consistency found ok, No Error.

But when create the process order ? Release? Control recipe creates: - Found error.

?Value cannot be assigned autom. To char. 0120 PPPI_UNIT_OF_MEASURE in

proc.instr. 0020 phase 0020?

Pl helps me for finding the solution of this error.

Thanks

Rajesh Tiwari

Accepted Solutions (1)

Accepted Solutions (1)

maheshbabu_mg
Advisor
Advisor
0 Kudos

Hi ,

Please refer the below SAP notes...

These notes exactly address your problem.

Note 391696 - No value is assigned to PPPI_UNIT_OF_MEASURE

193326 - No value can be assignd aut.to PPPI_UNIT_OF_MEASURE

155765 - PPPI_UNIT_OF_MEASURE is not valuated

Thanks & regards

Mahesh

Reward points if useful

maheshbabu_mg
Advisor
Advisor
0 Kudos

Hi Rajesh,

Many of the threads created by you on PP-PI are open...please close them if you are satisfied with the answers by awarding suitable points.

Thanks

Mahesh

Answers (1)

Answers (1)

Former Member
0 Kudos

In Master Recipe Go to Process Instruction Tab and there assign the Value to the characteristic char. PPPI_UNIT_OF_MEASURE .

former_member677849
Participant
0 Kudos

hi,

We need the system automatic assign the value Not manual.

Pl help

Former Member
0 Kudos

If this UOM is for components then you also have to maintain the correct Phase No to PPPI_Phase and that component should have been assigned to that phase.