when creating a material in the transaction code MM01 there is a field called MRP profile

where do we define it and what is the purpose of it

REgards,

Murali

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 28, 2008 at 11:01 AM

    MRP - Material Requirement Planning

    It is uesd to determine the SCHEDULE LINE.

    SCHEDULE LINE = ITEM CATEGORY + MRP TYPE

    Materials Requirement Planning (MRP) is a scheduling procedure for production processes that have several levels of production. Given information describing the production requirements of the several finished goods of the system, the structure of the production system, the current inventories for each operation and the lot sizing procedure for each operation, MRP determines a schedule for the operations and raw material purchases.

    Regards.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 28, 2008 at 11:09 AM

    got the answer

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.