PRT availability check

Hi all,

In the PRT availability check, my user wants the inventory to be checked for some specific storage locations alone.

Is there any settings available to restrict for some specific storage locations alone in PRT Check.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 28, 2008 at 10:40 AM

    dear,

    In spro (OPJJ) check which checling rule has the following setting

    storage location check - No storage loc check box is not active?

    that combination of checking rule and checking group should be used for PRT.

    -


    See the more information as below

    Availability checking in SAP

    Ave checking is done in SD/PP/MM....hence it is made of two parts

    Checking rule and checking group

    Checking rule(CR) is decided by the function. like for SD it is A, for PP module it is PP...

    Checking group(CG) is the value you enter in MRP3 view for a material in the plant level

    Hence combination of CR and CG will control how the material is to be checked for availability, in we define in Customizing what are the elements to be considered. like Stock, receipts like PO, issues like reservation from production order...

    in OPJJ you can see the details of whether storage location stock to be considered or plant level stock to be considered.

    if you activate the check no storage loc insp then stock is considered as plant level, if you uncheck it stock will be considered for ATP @ stocrage loc level mainatined in the transaction during ATP check.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      If u uncheck this, then the system will serach the stock in the storage loc whatb you have maintained in the production order, let us say you maintained SL02...against the PRT...system will check onky in SL02.

      i hope you got it

  • Posted on Jan 28, 2008 at 11:56 AM

    Hi,

    Pl first maintain the Scop of availibility according to client requirement . On that base system check the stock of PRT.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Scope of availability has been set in the OPJJ.

      You refer my previous answer on OPJJ.

      As there is no option to maintain Storage locations to include or exclude.

      suggest something fruitful.

  • author's profile photo Former Member
    Former Member
    Posted on Jan 29, 2008 at 09:47 AM

    Hi

    There are 2 types of setting

    For material level

    Go to MMSC and put value 1 in MRP field

    or

    For plant level

    Go to - Material Management - Consumtion based planning - planning - Define storage location MRP per plant

    and put MRP indicator 2

    Definately it will solve your problem

    reply

    Amit

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.