cancel
Showing results for 
Search instead for 
Did you mean: 

SOP using LIS

Former Member
0 Kudos

Hi,

In SOP ,when you do planning for material,there is an option of copy sales plan from SIS.For this you need to mention an info. structure and version.My query is whether we need to maention std. S076(SOP Info. Structure) or any other.But,I enter S076,system throws an error that source and target version can't be same.So,Is that mean the data and the version Iam using for MC93 will be stored in S076.So,we have to use other Info. Structure to copy sales Plan.How to map that.Kindly advise.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Stuti,

Whenever you wanna copy sales plan from SIS u have to mention a info structure which is not S076. S076 is the standard info sturucture where has u can create ur infor structure using tcode MC21. Please find below the steps for doing planning for a material in SOP.

1. MC21 create Info structure

2. MC7F Maintain Parameters for Info structure

3. Create Planning Type MC8A.

4. Create Planning Hierarchy MC61.

5. Create plan in active version ( Flexible Planning ) MC93

6. Convert plan in to active version (MC8V)

7. Transfer Material to demand management (MC90)

Please get back if you have any doubt as i have recently worked on the subject. Reward if useful.

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

for SOP it is S076 but you can copy this info. str. and make ur own if at all other fields are required in ur case.

reward points if useful to you.