What are the basic steps to be followed at the time of Implementation.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 21, 2008 at 09:35 AM

    Hi Sandy,

    SAP Business One

    The SAP Business One Accelerated Implementation Program" is a comprehensive implementation methodology created by SAP. The methodology has been designed to serve as a guideline for the system setup and implementation process. It includes the SAP Business One Implementation Guide and a set of templates, checklists, tools, and other supporting information that divide the implementation process into five phases. Each phase breaks down the relevant tasks that have to be completed, and suggests roles, responsibilities, and time frames required to successfully complete the implementation.

    Accelerated Implementation Program 2.0

    Table Of Contents

    1. Introduction

    2. Project Preparation (Phase 1)

    3. Business Blueprint (Phase 2)

    4. Project Realization (Phase 3)

    5. Final Preparation (Phase 4)

    6. Go-Live and Support (Phase 5)

    7. Summary

    8. Useful Links and Documentation

    9. Copyright

    SAP Business One Accelerated Implementation Program

    Log in to SAP Channel Partner Portal at: http://service.sap.com/smb/sbo/documentation

    Documentation Resource Center --> SAP Business One 2007 --> SAP Business One Accelerated Implementation Program

    --> SAP Business One Accelerated Implementation Guide.

    If you need more information please do visit the Wiki or Blog depending upon your level of information needed.

    I hope this helps you out, if it does do reward me for it...

    Regards,

    Shreyas

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 21, 2008 at 09:23 AM

    basic steps to be followed at the time of which Implementation u wnat?

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.