Hi

there are materials that are procured regularly from some vendors, these are trusted vendors sources for material quality. when ever there is an introduction of new vendor for supply of these materials, his supply has to go through quality management.

if we activate the quality management for these materials then the regular vendor's material also have to pass through QM. this will unnecessary will increase the work.

we want that QM should function exclusively for new vendors of our choice.

We donot want to have it by selection stock type QI, purely routed through QM.

pl help in this case.

rgds

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 18, 2008 at 04:00 PM

    That menans you are not using theQM module of SAP as per the SAP terminology.

    In this case what you can do is whenever you introduce the new vendor then receive that stock as GR blocked stock and the ask the quality to do the testing then move to unrestricted or return to vendor

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 18, 2008 at 08:24 PM

    Hello,

    When PO is created, you can designate the PO line to be received into the specific stock type (Unrestricted, Quality Inspection, Blocked Stock). This can be carried out in Item->Delivery tab in ME21N/ME22N.

    Thanks,

    Venu

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 19, 2008 at 04:18 AM

    Hi,

    In this case you can activate the material for quality in QM view of material master (transaction code MM01 / MM02). Use the control key with all the requirements of release active. Then maintain quality info record for the material for each vendor (transaction code QI01 / QI02). For your regular vendors, for whom, you don't want to create Inspection Lot at GRN, maintain condition 'No inspection Lot' at quality info record. For new vendors, maintain condition vendor not certified, Inspection lot for each GRN. After maintaining this condition, whenever you make GRN for your regular vendors, the material will be posted to unrestricted use. For other vendors, inspection lot will be created at GRN.

    Hope this works.

    Regards,

    Prashant

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.