cancel
Showing results for 
Search instead for 
Did you mean: 

PO Hard Stop by Material Type

Former Member
0 Kudos

We want to allow a PO with a PPV % variance for specific material types to pass and create a PO while for other material types we stop the processing of the PO if the PPV % loss it above the specified %. Is this possible in configuration or do we alter a BAPI or user exit?


Accepted Solutions (0)

Answers (1)

Answers (1)

pataselano
Active Contributor
0 Kudos

You can write your logic for PPV on BADI ME_PROCESS_PO_CUST - PROCESS_ITEM.