on 01-18-2008 4:33 AM
hi
while i run the ck11n i got a message that no structer could be determined for internal activity.
i want this for cost component split
Hi,
were you able to solve proble, if so plz suggest me with the same, as I'm facing the same problem.
I've assigned all the necessary cost elements in OKTZ, stil I'm getting this issue.
regards
sandhya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You need to assign the Cost element in the Cost component structure through t-code OKTZ.
Just assign the Internal activity type Cost element as shown in the error message to the relevant Cost component structure.
In OKTZ you can see in the navigation 'Assignment: Cost Component - Cost Element Interval ". Just click and then assign.
Thanks
Siva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
First you maintain in cost component structure, the prod. activity (Internal activity) attribute, and assign cost element(secondary internal activity type category).
Then plan cost/activity for the period.
then go for ck11n
Hope u got it.
Regards
Laxmiprasad
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
9 | |
5 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.