hi

while i run the ck11n i got a message that no structer could be determined for internal activity.

i want this for cost component split

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

were you able to solve proble, if so plz suggest me with the same, as I'm facing the same problem.

I've assigned all the necessary cost elements in OKTZ, stil I'm getting this issue.

regards

sandhya

sivaprasad_r
Active Contributor
0 Kudos

Hi,

You need to assign the Cost element in the Cost component structure through t-code OKTZ.

Just assign the Internal activity type Cost element as shown in the error message to the relevant Cost component structure.

In OKTZ you can see in the navigation 'Assignment: Cost Component - Cost Element Interval ". Just click and then assign.

Thanks

Siva

Former Member
0 Kudos

Hi Thanks Siva

can u pls give me ur mail id

its me

mallikarjunacwa@gmail.com

Former Member
0 Kudos

Hi

First you maintain in cost component structure, the prod. activity (Internal activity) attribute, and assign cost element(secondary internal activity type category).

Then plan cost/activity for the period.

then go for ck11n

Hope u got it.

Regards

Laxmiprasad

Former Member
0 Kudos

Hi

Please explain me this by steps assign plan activity

pls with t-codes u explain me

or send me to my maild id

mallikarjunacwa@gmail.com

thanks

mallikarjuna

i need this urgent to solve Laxmi gaaru