Synchronize Content DEV QA PRD

Hi, How does one go about keeping the Portal Landscape in synch? I have quite a few Roles and Worksets that I deleted in my development environment that still exist in my QA and PRD.. What is the best practice to keep these in synch?

Thanks, Ken Murray

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Jan 17, 2008 at 03:53 PM

    Unfortunately... it is a manual deletion. So what you can do is class it as manual config and record it in documentation etc.

    Paul

    Add a comment
    10|10000 characters needed characters exceeded

    • I hope you feel better for the rant. I know how you feel though - I've been doing EP since release 5 (which was really release 1) and whilst a lot of things have improved immensely, thing as like transports and monitoring (without Solution manager) haven't really moved on much.

      When I used to teach the EP Academy, it was embarassing at times, particularly when you're used to standard ABAP with CTS and all of the tools in CCMS.

      Paul

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.