Skip to Content

auto project triggering in sales order

Hi

When i am creating sales order(service item), it is automatically picking up wbs element after saving the sales order.

The number for wbs element is just like sales order, no. It is copying standard project and wbs for this

My question is what is the link between these

where i can see the defaults settings for automatic picking of wbs element

regards

chidambaram

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 17, 2008 at 10:28 AM

    Hi Chidambaram and friends,

    This must be as a result of Assembly Order Processing where a Network and a Project are created automatically for every Sales Order Item depending upon the settings.

    For this a standard network is required which must be linked to a material (may be a service material). Then with the help of other customising settings, a project is created whose number is derived on the basis of Sales Order number.

    If I am wrong, please let me know.

    regards

    Pratap.V

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 17, 2008 at 11:00 AM

    Hai Chidambaram,

    The link is we have to maintain a Standard WBS in CJ92 and a Standard Network in CN02 ( Display).

    Then we need to assign the material to the Std WBS and Std network in CN08.

    In materail master there are few settings, Strategy group 83 or 85 in MRP view, Item category group 0005, 0008 etc in the sales view.

    These are some important settings for automatic picking of WBS

    RamananPV

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 17, 2008 at 11:26 AM

    For more details on this, go to the following link.

    http://help.sap.com/saphelp_46c/helpdata/en/d7/b8853488601e33e10000009b38f83b/frameset.htm

    regards

    Pratap

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 18, 2008 at 05:07 AM

    Hi Chindamaram,

    I agree with what other experts say.

    This scenario is mentioned in detail under Assembly Processing in Project System.

    I have recently prepared one doc on this.Send me your mail id. I will forward it to you for better understanding.

    Regards

    Tushar

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.