Skip to Content
author's profile photo Former Member
Former Member

assignment of plant to many company codes

Hi

I have a discussion with my colleagues.

One plant is assigned to many company codes or not if it is possible how in which t-code

Thanks

Mallikarjuna

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Posted on Jan 16, 2008 at 12:46 PM

    hi,

    no it is not possible.

    (the assignment is done in tcode OX18, and it is stored in table T001K, where the plant is the key field, which also shows that it is not possible.)

    ec

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 16, 2008 at 01:07 PM

    Hi,

    Company code is at the higher level of hirarchy for created for legal reporting of financial data, whereas Plant is an operational area within a company code. hence it is not possible to assaign one plant to multiple company codes.

    Regards

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 16, 2008 at 01:45 PM

    A plant can be assigned to only one company code. This is obvious looking in the perspective of valuation of materials. The value of a material kept in a plant cannot be accounted for 2company codes.

    The cardinality between plant and company code is one to one, vice versa(Company code to Plant) is one to many.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 18, 2008 at 08:00 PM

    Hi,

    In ECC 6.O , i encountered this question from many friends and i have tested and clarified the issue.

    If a plant X is assigned to company code ABC, then in the assignment table, the same plant can be assigned to another Company code PQR, but the system will automatically removes the earlier assignment and updates the assignment of Plant X to PQR.

    Initially, it appears that system accepts the entry , but while accepting the new entry, it will overwrite the old one.

    One plant can be assigned to only one Company code. And this basic rule can never be changed.

    Thanks

    Siva

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.