calculation wbs bom

hello!

is there an easy way to calculate just the material costs of a wbs bom (similar to transaction CK51N for order boms)? the wbs will be specific for each project, therefore i don't think that easy cost planing will work (SAP R/3 4.6c)

thanks!

matthias

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 16, 2008 at 12:25 PM

    Hi Matthias,

    I do not think that there is an easy way to calculate the material costs of a WBS BOM.

    The materials of the BOM have to be transferred to the project through BOM Transfer so that all the materials' cost will reflect in the project.

    regards

    Pratap

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      BOM Transfer is as good as manual attachment of materials. So when you transfer the materials from BOM to your project, you can see the total costs in the Plan/Actual report itself. I also had this issue in my project. So, instead of using a header material in your project, I just transferred the materials. I had no other way.

      Hope I have answered your question correctly.

      regards

      Pratap

  • author's profile photo Former Member
    Former Member
    Posted on Jan 17, 2008 at 03:50 AM

    Hi,

    To obtain cost in WBS BOM, you can use material costing functionality. Once you run costing for header materials, then planned cost of BOM will be obtained.

    Hope this will help you.

    Regards,

    Rakesh Pradhan

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hello ,

      I am facing similar problem.....can you please help me understand how u resolved it. I can not transfer the BOM in to Project because I have issues....

      1) I transfer, requirement for header component will not get generated.

      2) Requirement date for the child components will not flow as per the routing timings.

      3) While in planr parameters for MRP seetings , I flagged Sale orer/WBS bom indicator, hence during MRP run, if a WBS bom exists, system xplodes it and neglects Material BOM.

      4) Because seeting mentioned in point 4 , I amm assigning header component to project activity manually....drag nad Drop.

      However, similarly I want to dectate planned cost run to consider WBS Bom composition not the Material BOM.

      Help me with a solution.

      Thanks

      Saikishore Ganga.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.