on 01-16-2008 7:26 AM
Dear all
Presently we are using ECC5 ,oracle 9.2.0.7 .os windows 2003 server.database size 600 GB
we want install quality server , same as the production server ,how can we proceed.
Please describe.
thanks
with best regards
venkat
Hi,
Install the QA Server and use backup/restore method to replicated your PRD server to QA..
The second option is export the PRD data thru sapinst but i think it will take more time than the above one as you have 600Gb data
Regards
Umesh K
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear All
Mens when I install the quality server SAP SID is same on production server or diffrent ,and also location of the the controal file and datAFILE ARE THE SAME ,
MENS FIRST INSTALL OTHE CENTRAL INSTANCE THEN DATBASE INSTANCE THE USING OF THE BRTOOLS AND RESTORE THE DATABSE OF THE PRODUCTION SERVER .
THANKS
WITH BEST REGARDS
VENKAT
Hi,
Install fresh QA system and then perform a homogenous system copy from as per SAP system copy guide.
Regards,
Wojtek
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
83 | |
24 | |
12 | |
9 | |
7 | |
6 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.