Hi
I am facing costing error in production order, so I checked the corresponding sales order and checked the costing it gives the error message.
No itemization available for the corresponding material on the plant.
Note: I checked the sales order its not pulling the routing for the material [Configurable] can you tell me please how to link with sales order.
Thanks in Advance.