Hi Gurus,
I'll be performing a Heterogenous Copy (from 4.0 Oracle 8/ Sun -
> Win2003/SQL) and then will upgrade in to ECC 6.Since this will be a very heavy task for me, really appreciated it if someone who has experience can share with me in this cross platform environment.My Question :
1) Which is the best method to perform Hetero Copy:
a. Make the target system the same level (4.0) as the source system and then upgrade to 4.6D ext or
b. Upgrade the SAP on the source system (4.0 to 4.6D ext) and then do R3Load?
2) Which one is the best pre-upgrade before upgrading to ECC 6.0?
a. Upgrade to 4.6D ext or 4.7?
b. on the target system SQL 2000 SP4 or SQL 2005 SP2 (Still not confident with the SQL 2005 yet - too many issues )
c. On oracle level, theres no need to upgrade from 8 to 9.2 is it?
Is there any sapnotes/forum that I can refer too?
TQ